Four ways to maintain a machine
| Approach | When work happens | Fits |
|---|---|---|
| Reactive | After a failure | Cheap, non-critical items with a spare on the shelf |
| Preventive | On a calendar or run-hour schedule | Wear that follows usage closely, such as filters and belts, and inspections required on a schedule |
| Condition-based | When a measured value crosses a limit | Equipment with a measurable sign of wear, such as bearing temperature |
| Predictive | When trends or a model show failure is likely soon | Critical equipment with good data and a known failure pattern |
Predictive maintenance does not replace the others. It works in the interval between the moment a developing fault becomes detectable and the moment the machine fails, which reliability engineers draw as the P-F curve. The earlier a fault is detected, the more time planners have to order parts and book a shutdown. See the glossary entry on predictive maintenance for the short definition.
The data you need before machine learning
This is the honest part. A model learns from examples, and most sites are short of them. Before any machine learning, check:
- An asset register with a hierarchy and criticality: which pump is which, what it serves, and what a failure costs in downtime, safety and repair.
- Work orders with failure codes. If most say 'repaired' in free text, the history cannot tell which failures happened. Clean codes on the critical assets are often the first fix.
- Enough failures of the same kind. Well-maintained equipment fails rarely, which is good for the plant and bad for a model. One bearing failure in three years is not a training set.
- Signals at the right rate. Bearing defects show in vibration measured thousands of times a second; a temperature averaged every fifteen minutes by a building management system will not see them.
- Operating context: load, speed, running or stopped, so a machine that is switched off is not flagged for a sudden drop in vibration.
- Clocks that agree. Timestamps from sensors, the historian and the maintenance system aligned to one time zone.
If several are missing, start with rules on the assets whose data is good, and fix the data while the rules run. Our article on preparing your data for AI and our data integration work cover how.
Condition rules engineers can read
Rules capture what your engineers already know, and they are predictable and testable. Good rules combine signals and require persistence, so one noisy reading does not raise an alarm:
- Bearing temperature above the manufacturer's limit for more than ten minutes while the motor is running.
- Vibration rising steadily over two weeks at constant load, even while it is still below the alarm level.
- Motor current up while pump flow is unchanged, which can point to friction or a mechanical fault.
- Pressure difference across a filter above its change point.
- Run hours or start counts reaching a service interval.
Engineers change thresholds in a screen, not in code, and every change is versioned with who made it and why. Once months of normal operation are recorded across the seasons (a chiller in a Gulf summer works very differently from the same chiller in winter), anomaly detection can flag patterns no rule describes. Models that estimate remaining useful life come last, and only for failure modes with enough history.
From alert to work order, and back
An alert nobody acts on is noise, and too much noise teaches people to ignore alerts. Each alert follows a fixed path:
- It reaches a reliability engineer's or planner's queue with the asset, the rule, a chart of the data and the asset's recent work orders.
- They dismiss it with a reason, keep watching it, or raise a work order.
- The work order is created in your computerised maintenance management system (CMMS) through its API, with the symptom, a suggested inspection and a priority.
- The technician records what was found, with a failure code, on a mobile screen in Arabic or English.
- That finding marks the alert as confirmed or false, which is how rules are tuned and, later, how a model gets labelled examples.
Alerts are suppressed during planned shutdowns, and each asset has an alert budget: a rule that fires too often is reviewed, not tolerated. A language model can draft the work order description from the alert and pull the relevant pages of the manufacturer's manual through a knowledge assistant. It never closes an alert or changes a rule on its own.
Keeping the control network out of reach
Condition data often comes from the network that runs the plant: PLCs, SCADA, a data historian or a building management system. That network matters more than any dashboard, so our designs follow a few rules:
- Read only, one way. Data leaves the control network through a gateway or a historian copy in a separate network zone. The maintenance software never writes to a controller and cannot start or stop a machine.
- Standard protocols such as OPC UA or MQTT, with authentication and encryption switched on.
- Gateways treated as servers: a named owner, patching, unique credentials and no default passwords.
- A threat model before connection, covering who could reach the gateway and what they could do from it.
Industrial security has its own standards, such as the IEC 62443 series for industrial automation and control systems. We design with awareness of them and of your site's rules, and work with your control engineers, who keep authority over the control network. Our cybersecurity service covers the review.
Judging the pilot over months, not weeks
Failures are rare, so results take time to read. Pick a small group of critical assets with a known failure pattern and record a baseline: unplanned downtime, emergency work orders, maintenance cost and mean time between failures on those assets, plus how often preventive work is done on schedule. After launch, add alert quality: the share of alerts that led to a confirmed finding, and failures that arrived without an alert. Plan to judge the pilot over months, and tell whoever funds it so at the start.
How a predictive maintenance project usually starts
We start with a data audit inside a discovery sprint: which sensors and systems exist, what the maintenance history holds, which assets are critical, and how data can leave the control network safely. You receive a roadmap naming the pilot assets, the first rules, the data fixes and the CMMS integration. Then we build the pilot with weekly demos, as part of our AI agents and automation service. In buildings, the maintenance request history is often the first source of failure records.