Where RFIs and submittals slip today
On many projects the RFI log is a spreadsheet kept by one document controller, while the real conversation happens in email. A site engineer spots a clash between a duct and a beam, writes a question and sends it to the consultant. The answer arrives as a reply to a reply, someone updates the spreadsheet when they have time, and the foreman on level four may never see it.
Submittals follow the same pattern with more at stake. Shop drawings, product data, samples and method statements go out for review and come back approved, approved as noted, revise and resubmit, or rejected, and every resubmission restarts the clock. The cost shows up in familiar ways:
- Work built from a superseded drawing: the answer changed the design, but the site kept the old revision.
- Long-lead items ordered late: the submittal for the chillers or the lifts sat with the reviewer, and nobody tracked the review period.
- The same question asked twice, by two subcontractors, weeks apart.
- Thin records in a dispute: nobody can show when a question was raised or how long the answer took.
- Hours lost every week assembling the status report by hand.
On many Gulf sites the letters RFI also mean a request for inspection, and design questions are raised as technical queries. The software should follow the names, numbering and forms in your contract, not ours.
What the tracking system contains
The core is one register for each kind of item, built around the question every site meeting asks: whose move is it? Contractors call this ball-in-court, and the system is designed around it.
The RFI and submittal registers
- One record per item: number, title, discipline, location by level, zone or grid line, the drawing numbers and revisions, and the specification section it touches.
- Ball-in-court and a status history: draft, sent, under review, answered, closed, with a name and a time on every change, so you can see how long each party held the item.
- Due dates from your contract: the review period it sets for submittals and the response date agreed for each RFI, with this week's due items listed first.
- Cost and time flags: when an answer may change the price or the programme, the item is marked as a potential change order instead of being forgotten.
- Revision chains for submittals: each resubmission of a shop drawing linked to the last, with the reviewer's comments on each, so the next one answers every comment.
Drawings, reminders and the status report
Each answer links to the drawing revision it affects. When a revised drawing is issued, the system marks the old revision as superseded on every RFI that mentions it, and the site app shows the current one first. Reminders go out before an item is due: to the reviewer, then to the person who manages that relationship, then to the project manager. The weekly report for the progress meeting comes straight from the registers: open items by age and by party, overdue items, and submittals that hold up long-lead procurement.
Where an AI assistant helps, and where it must stay out
Most of this system is ordinary, dependable software. An AI assistant earns its place in a few jobs, and a person checks its output every time:
- Drafting the question. The engineer takes a photo, marks up the drawing and adds a rough note; the assistant drafts a clear RFI with the drawing references for the engineer to edit and send.
- Finding earlier answers. Before a new RFI goes out, the assistant searches past RFIs, the specification and the minutes, and shows any answer that already exists, with its source. This is search over your own documents, not the model's memory.
- Drafting the submittal register. Specification sections list the submittals they require; the assistant reads them and drafts the register for the document controller to check.
- Summarising long threads. A three-week email chain about a facade detail becomes a short summary on the record.
The assistant never answers an RFI. The answer comes from the designer responsible for that part of the work, who carries the responsibility for the design. Because the assistant can be wrong, every draft shows its sources and nothing is sent until a person approves it; see human in the loop.
Connecting it to the tools you already use
A tracker is only useful if it sits where the work already happens. Typical connections:
| System | What moves | Direction |
|---|---|---|
| Email (Microsoft 365 or Google Workspace) | Replies, filed against the right record by RFI number | Into the tracker |
| Document control platform | Transmittals, formal responses and drawing revisions | Both ways, or one way if it is the formal record |
| Drawing register | The current revision of each drawing, so superseded ones are flagged | Into the tracker |
| Programme (Primavera P6 or Microsoft Project) | Required-by dates for submittals, tied to procurement and installation activities | Into the tracker |
| Site app and messaging | A notice to the foreman when an answer affects their area | Out of the tracker |
Replies the system cannot match to a record, such as an answer sent without the RFI number, go to a short queue for the document controller instead of being guessed. If your consultant requires a platform such as Oracle Aconex or Procore as the formal record, we connect to it through its API where the platform allows, so nobody types everything twice. If an off-the-shelf platform already fits your forms, use it; a custom build makes sense when it does not, or when you need the data in your own reports (see building versus buying software).
Keeping drawings and the record secure
Drawings can be sensitive: think of a bank vault, a data centre or a government building. The log is also evidence if a dispute arises. We design for both, starting with a threat review of who can see and change what:
- Access by company and package: a subcontractor sees its own RFIs and submittals, not the whole project, following least privilege.
- External accounts for the consultant and designers, with multi-factor authentication and access that ends when the project does.
- An audit trail nobody can edit: every status change, date and attachment is recorded with who made it and when.
- AI settings checked before any document reaches a model provider: whether data is retained or used for training, and where it is processed.
- Exports and backups, so the full project record can be handed over at completion.
How to tell whether it is working
Measure before you build, so the comparison is honest. Take the RFI and submittal logs from one recent or current project and record:
- Average days from an RFI being raised to the answer reaching site.
- Number of items overdue at each progress meeting.
- How many submittals come back as revise and resubmit, and the most common reasons.
- Hours spent each week preparing the status report.
- Questions asked more than once.
Compare the same figures after a few months of use. Response times depend on the consultant as much as on any software; what the tracker changes is visibility, so late items are chased early and nothing is lost. Our article on measuring the return on automation explains how to keep the comparison fair.
How a project like this starts
Usually with a discovery sprint of about two weeks. We study your current registers, forms and numbering, map the path of an RFI and a submittal from site to consultant and back, prototype the site and office screens, and write a threat model of the core flows and a roadmap, with progress shown in weekly demos. See how we work and the engagement options. Many teams add site progress reporting next, since daily reports draw on the same project data.